Public Access
docs: update ORIENTATION.md for Phase 1 complete
This commit is contained in:
+22
-31
@@ -18,9 +18,14 @@ The family has been using meal kit services (Blue Apron → EveryPlate → Hungr
|
||||
|
||||
### Current Status
|
||||
|
||||
**Phase**: Documentation complete. Implementation NOT started.
|
||||
**Phase**: Phase 1 complete. Phase 2 (Database & Models) next.
|
||||
|
||||
All planning documents are written and committed. The next step is Phase 1: Infrastructure & Foundation (setting up Docker, PostgreSQL, FastAPI skeleton, React frontend).
|
||||
Infrastructure skeleton is committed:
|
||||
- docker-compose.yml with 4 services (backend, frontend, db, nginx)
|
||||
- FastAPI backend with placeholder API routes
|
||||
- React frontend with Vite + Tailwind + placeholder pages
|
||||
- nginx reverse proxy config
|
||||
- SQLAlchemy models created (not yet connected to real endpoints)
|
||||
|
||||
---
|
||||
|
||||
@@ -105,7 +110,7 @@ User (web) ───► React UI ──► nginx ──► FastAPI ────
|
||||
|
||||
| Phase | Description | Status |
|
||||
|-------|-------------|--------|
|
||||
| 1 | Infrastructure (Docker, PostgreSQL, FastAPI, React, nginx) | **Not Started** |
|
||||
| 1 | Infrastructure (Docker, PostgreSQL, FastAPI, React, nginx) | **Complete** |
|
||||
| 2 | Database & Models (SQLAlchemy models, Alembic migrations) | Not Started |
|
||||
| 3 | API Endpoints (CRUD, meal plans, shopping list, feedback) | Not Started |
|
||||
| 4 | Lucky California Scraper (weekly ad, Playwright) | Not Started |
|
||||
@@ -145,43 +150,29 @@ AI_IMAGE_ENABLED=false
|
||||
|
||||
## Next Steps
|
||||
|
||||
### IMMEDIATE: Start Phase 1
|
||||
### IMMEDIATE: Phase 2 - Database & Models
|
||||
|
||||
1. Create `docker-compose.yml` with all 4 services
|
||||
2. Create backend directory structure and FastAPI skeleton
|
||||
3. Create frontend with Vite + React + TypeScript + Tailwind
|
||||
4. Set up nginx reverse proxy config
|
||||
5. Create `.env.example` file
|
||||
1. Set up Alembic for migrations
|
||||
2. Create actual database tables from SQLAlchemy models
|
||||
3. Add seed data (basic ingredients, sample recipes)
|
||||
4. Create Pydantic schemas for API validation
|
||||
5. Implement real API endpoints (not just placeholders)
|
||||
|
||||
### After Phase 1 Complete
|
||||
### After Phase 2 Complete
|
||||
|
||||
- Verify all services start: `docker-compose up -d && docker-compose ps`
|
||||
- Test health endpoint: `curl localhost:8000/health`
|
||||
- Test frontend builds: `cd frontend && npm run build`
|
||||
- Verify migrations: `docker-compose exec backend alembic upgrade head`
|
||||
- Test database connectivity: `curl localhost:8000/health/db`
|
||||
- Test API endpoints with real data
|
||||
|
||||
### Current Git State
|
||||
|
||||
```bash
|
||||
git log --oneline
|
||||
# (empty - no commits yet)
|
||||
1328ec3 feat: add Phase 1 infrastructure skeleton
|
||||
0c5b0aa docs: add complete project documentation
|
||||
```
|
||||
|
||||
All documentation is written but NOT YET COMMITTED. Commit with:
|
||||
```bash
|
||||
git add docs/ README.md meal-planner-plan.md
|
||||
git commit -m "docs: add complete project documentation
|
||||
|
||||
- SPEC.md: project specification and goals
|
||||
- ARCHITECTURE.md: system design and component descriptions
|
||||
- database-schema.md: PostgreSQL schema with all tables
|
||||
- implementation-plan.md: 12-phase implementation guide
|
||||
- RUNNING.md: deployment and troubleshooting guide
|
||||
- README.md: project overview
|
||||
|
||||
Family profile: 2 adults, 2 children. Mushroom avoidance for 3/4.
|
||||
Approval workflow: email proposals, one denial swaps meal.
|
||||
Tech stack: FastAPI, PostgreSQL, React, Playwright, SendGrid."
|
||||
```
|
||||
Phase 1 skeleton complete and committed. Phase 2 (Database) is next.
|
||||
|
||||
---
|
||||
|
||||
@@ -253,4 +244,4 @@ docker-compose logs -f
|
||||
- **Wife**: Non-technical, will use web UI and email
|
||||
- **Children**: 2, eating habits vary (one OK with mushrooms)
|
||||
|
||||
Last updated: 2026-05-04 (after documentation completion)
|
||||
Last updated: 2026-05-04 (Phase 1 complete, Phase 2 next)
|
||||
|
||||
Reference in New Issue
Block a user