Sprint 6 (F3 + F4) is now documented across the project:
- Review/sprint6-verification.md: new deploy + smoke-check doc.
Backend + frontend deploy (no migration). 5 smoke-check
sections: A) ShoppingList bulk-add end-to-end, B) F3 partial-
failure edge case, C) F4 'Plan the week' button + dropdown,
D) F4 edge cases (no empty slots, all recipes used, invalid
meal_types), E) Sprints 1-5 regression spot-check. Rollback
section covers revert (no migration to undo).
- fix-ui-audit.md: new Sprint 6 section (S6.1 F3, S6.2 F4,
S6.3 verification gate). 'Done when' block updated to 6
sprints / 10 commits / 20 findings closed.
- Review/handoff-ui-audit.md: updated to a 6-sprint cycle. TL;DR
table includes the 8ad4ef6 row. File list includes sprint6-
verification.md. File-level diff summary gains 8 new rows for
Sprint 6 (F3 backend + F4 backend + 3 new schemas + 2 api
bindings + 2 page changes). §Future list now strikethroughs
F3 and F4. Follow-up tickets section added: the no-op
'Generate Meal Plan' empty-state CTA, the (now-narrower) Pantry
bulk-add ticket, and the 'Sprints 2-5 + Sprint 6 separate
batch' deploy note.
- Review/ui-nielsen-audit.md: new Sprint 6 status block at the
top. F3 + F4 documented with the design-decision context
(ShoppingList-only scope; dropdown for All/Dinners; partial-
success with detailed report).
- docs/HANDOFF.md: Last-updated line bumped to 6 sprints / 10
commits / 20 findings / 6 §Future items. Header commit list
gains the 8ad4ef6 row. New 'Sprint 6' subsection in the
2026-06-04 session block. Commit table gained the 8ad4ef6 row.
Files-modified + Files-added lists updated.
No code changes; the 3 pre-existing WIP files (backend/app/api/
recipes.py, schemas/recipe.py, nginx/nginx.conf) are deliberately
not staged.
Sprint 5 (F5 + F2 + 0015 cast fix) is now documented across the project:
- Review/sprint5-verification.md: new deploy + smoke-check doc.
Backend + frontend deploy (one batch with Sprints 2-4). Migration
0015 MUST be run as part of this deploy (the cast fix is what
makes it runnable). 7 smoke-check sections: A) curl tests for
?week_start=, B/C/D) URL week nav on Dashboard and Shopping List
with query-key isolation, E) keyboard shortcut matrix, F) post-
migration canonical-aisle verification query, G) Sprints 1-4
regression spot-check. Rollback section covers reverts + the
persist_aisle_backup recovery path.
- fix-ui-audit.md: new Sprint 5 section (S5.0 critical 0015 fix,
S5.1 F5 implementation, S5.2 F2 implementation, S5.3 verification
gate). 'Done when (overall)' block updated to 5 sprints + 9
commits + 18 findings closed + the 0015 fix unblocks Sprint 2.
- Review/handoff-ui-audit.md: updated to a 5-sprint cycle. TL;DR
table includes the d78bd18 + f740f40 rows with the CRITICAL 0015
fix callout. file-list includes the new sprint5-verification doc.
file-level diff summary gains 16 new rows (S5 backend + frontend +
0015 + hooks/components). §Future list now strikethroughs F2 and
F5. Quick-start deploy commands list Sprints 2-5 as a single
batch (backup → migrate → rebuild backend + frontend).
- Review/ui-nielsen-audit.md: new Sprint 5 status block at the
top. F5 + F2 + the 0015 fix all documented. Cross-ref to
Review/sprint5-verification.md.
- docs/HANDOFF.md: Last-updated line bumped to 5 sprints / 9
commits / 18 findings / with the 0015 fix CRITICAL callout.
Header commit list gains the two Sprint 5 commits. New 'Sprint
5' subsection in the 2026-06-04 session block. Commit table
gained the d78bd18 + f740f40 rows. Files-modified list now
includes all 5 sprints' changes. New 'Files added by Sprint 5'
subsection for the 3 new files in hooks/ + components/.
No code changes; the 3 pre-existing WIP files (backend/app/api/
recipes.py, schemas/recipe.py, nginx/nginx.conf) are deliberately
not staged.
Sprint 4 (F7 + F6) is now documented across the project:
- Review/sprint4-verification.md: new 100-line deploy + smoke-check
doc. Frontend-only deploy (git pull + docker compose up -d --build
frontend). 5 smoke-check tables: A) success toasts still work for
all 11 actions, B) error path shows FastAPI detail (network-down
is the easiest test; full Pydantic 422 verification via curl +
DevTools 'Edit and resend'), C) pre-flight toasts still fire
without a network call, D) plan-status Badge has correct
aria-label in DevTools, E) Sprint 1-3 regression spot-check.
Includes rollback instructions (single-commit revert).
- fix-ui-audit.md: new Sprint 4 section with full per-task notes
(S4.1 F7 implementation details, S4.2 F6 aria-label, S4.3
verification gate). 'Done when (overall)' block updated to 4
sprints + 7 commits + 16 findings closed. No new commit in
fix-ui-audit.md for the F8/F9 §Future addendum (those are noted
in Review/handoff-ui-audit.md but live in the doc/proposals/
tree, not in the UI-audit plan).
- Review/handoff-ui-audit.md: updated to a 4-sprint cycle. TL;DR
table includes the d71b67a row, file-list includes the new
verification doc, file-level diff summary gains 5 new rows for
Sprint 4, §Future list now strikethroughs F6 and F7, and the
Quick-start deploy commands list Sprint 4.
- Review/ui-nielsen-audit.md: new Sprint 4 status block at the
top with the F7/F6 changes, the no-backend-changes note, and
a cross-ref to the new verification log.
- docs/HANDOFF.md: Last-updated line bumped to 4 sprints / 7
commits / 16 findings. New 'Sprint 4' subsection in the
2026-06-03 session block. Commit table gained the d71b67a row.
Files-modified list gained the lib/toast.tsx, App.tsx, and
three pages changes for Sprint 4 (with B-tags preserved).
No code changes; the 5 pre-existing WIP files (backend/app/api/
meals.py, recipes.py, schemas/recipe.py, frontend/src/api/index.ts,
nginx/nginx.conf) are deliberately not staged.
Review/handoff-ui-audit.md is a focused handoff for a fresh agent taking
over the UI/UX audit and fix cycle (Sprints 1, 2, 3). It complements
docs/HANDOFF.md (project-wide) rather than duplicating it.
Covers:
- Commit table (f3e4a44 / ccc70aa / f5fb755 / e90a9d6) and deploy
status (Sprint 1 deployed, Sprints 2-3 awaiting deploy).
- Per-sprint file-level diff summary so the next agent can audit the
changes without re-reading the audit doc.
- Environment quirks: deployment host is not this machine; psql lives
in the db container; frontend/src/lib/ is force-added because of a
pre-existing .gitignore bug; pre-existing WIP in git status; ESLint
not configured.
- Active risks: backend migration not yet run; Dashboard Undo rebuilds
not restores; S3.5 a11y caveats.
- The 9 explicit follow-up items in audit \xa7Future.
- Quick-start for the next agent.